NEWS

Company updates, industry insights and exhibition information.

Equal and Reducing Tee RFQ Checklist

For a tee inquiry, identify the run and branch requirements separately. This avoids an incomplete quotation when the branch size or wall thickness differs from the main pipe.

Equal or reducing configuration

State the required configuration and list the run size and branch size. Include wall thickness, material grade, connection type and the project standard. Attach an approved drawing for any special geometry.

Quantity and supporting documents

Provide quantities by item and your documentation requirements. Specify inspection, traceability, marking, surface finish and packing needs where required by the purchase specification.

Check the quotation before ordering

  • Confirm every size and material matches your request.
  • Confirm which tests and documents are included.
  • Confirm the delivery destination, agreed terms and schedule.
  • Resolve any technical deviations with your project engineer.

Hebei Huachuang supplies quotations based on the requirements provided. Final service suitability is determined by the approved project design.

Browse tees or request a tee quotation.

Ready to Work With Us?

Send us your drawings or specifications — our engineers will reply with a competitive quotation within 24 hours.

Get A Quote